(Shippingport Atomic Power Station). Quarterly Operating Report, First Quarter 1979

(Shippingport Atomic Power Station). Quarterly Operating Report, First Quarter 1979
Author :
Publisher :
Total Pages :
Release :
ISBN-13 : OCLC:1065639881
ISBN-10 :
Rating : 4/5 ( Downloads)

Book Synopsis (Shippingport Atomic Power Station). Quarterly Operating Report, First Quarter 1979 by :

Download or read book (Shippingport Atomic Power Station). Quarterly Operating Report, First Quarter 1979 written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: At the beginning of the first quarter of 1979, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops in service. The remainder of the expended PWR Core 2 was in storage under shielding water in the deep pit of the Fuel Handling Building. The 1A, 1B, 1C, and 1D 991 psig self-actuated steam relief valves remained gagged during the quarter to prevent leakage through the valve seats. Gagging of redundant relief valves is permitted by ASME Code and approved operating procedures. During the quarter, the Station was operated for Duquesne Light Company system grid including base load and swing load operation. Seven (7) swing load operations were performed on the LWBR Core this quarter to complete the LWBR operating plan of fifty (50) during this operating phase. The LWBR Core has generated 10,771.43 EFPH from startup through the end of the quarter. The generator load factor this quarter was 85%.


(Shippingport Atomic Power Station). Quarterly Operating Report, First Quarter 1979 Related Books

(Shippingport Atomic Power Station). Quarterly Operating Report, First Quarter 1979
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

At the beginning of the first quarter of 1979, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC
(Shippingport Atomic Power Station. Quarterly Operating Report, Fourth Quarter 1979).
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

At the beginning of the fourth quarter of 1979, the Shippingport Atomic Power Station was in operation with the 1A, 1B and 1C loops operating and the Station li
Shippingport Atomic Power Station. Quarterly Operating Report, First Quarter 1973
Language: en
Pages:
(Shippingport Atomic Power Station). Quarterly Operating Report, Second Quarter 1979
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

At the beginning of the second quarter of 1979, the Shippingport Atomic Power Station remained shutdown for the normally planned semiannual maintenance and test
SHIPPINGPORT ATOMIC POWER STATION. Quarterly Operating Report, First Quarter 1972
Language: en
Pages: