(Shippingport Atomic Power Station). Quarterly Operating Report, Second Quarter 1979

(Shippingport Atomic Power Station). Quarterly Operating Report, Second Quarter 1979
Author :
Publisher :
Total Pages :
Release :
ISBN-13 : OCLC:925445319
ISBN-10 :
Rating : 4/5 ( Downloads)

Book Synopsis (Shippingport Atomic Power Station). Quarterly Operating Report, Second Quarter 1979 by :

Download or read book (Shippingport Atomic Power Station). Quarterly Operating Report, Second Quarter 1979 written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: At the beginning of the second quarter of 1979, the Shippingport Atomic Power Station remained shutdown for the normally planned semiannual maintenance and testing program, initiated March 23, 1979. The station was in a cooldown condition at approximately 150/sup 0/F and 300 psig with a steam bubble maintained in the pressurizer and the reactor coolant pumps in slow speed. The reactor plant cooldown heat exchanger was in service to maintain coolant temperature. The 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops remained in service. The remainder of the expended PWR Core 2 was in storage under shielding water in the deep pit of the Fuel Handling Building. The 1A, 1B, 1C, and 1D 991 psig self-actuated steam relief valves remained gagged during the quarter to prevent leakage through the valve seats. Gagging of redundant relief valves is permitted by ASME Code and approved operating procedure. The LWBR Core has generated 10,771.43 EFPH from start-up through the end of the quarter.


(Shippingport Atomic Power Station). Quarterly Operating Report, Second Quarter 1979 Related Books

(Shippingport Atomic Power Station). Quarterly Operating Report, Second Quarter 1979
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

At the beginning of the second quarter of 1979, the Shippingport Atomic Power Station remained shutdown for the normally planned semiannual maintenance and test
(Shippingport Atomic Power Station. Quarterly Operating Report, Fourth Quarter 1979).
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

At the beginning of the fourth quarter of 1979, the Shippingport Atomic Power Station was in operation with the 1A, 1B and 1C loops operating and the Station li
(Shippingport Atomic Power Station). Quarterly Operating Report, First Quarter 1979
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

At the beginning of the first quarter of 1979, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC
Shippingport Atomic Power Station. Quarterly Operating Report, Second Quarter 1970
Language: en
Pages:
Shippingport Atomic Power Station Quarterly Operating Report. Second Quarter, 1971
Language: en
Pages: